Modular Healthcare Buildings

Modular Healthcare Buildings

Modular Healthcare Buildings

Prefabricated Buildings Minimising Impact on Patients, Staff and Daily Healthcare Needs

With prefabricated designs and structures, Prebuilt allows for sustainable and practical healthcare buildings to be built across Victoria. Prebuilt has facilitated and constructed structures used in the health sector – including wellness centres, medical centres, hospitals and specialised care buildings. At Prebuilt, we pride ourselves on our modular and flexible designs and our contribution to the healthcare industry that significantly minimises the impact on patients, staff and daily healthcare.

A Fast Tracked Process

We understand the urgent nature of healthcare infrastructure construction, and that is why Prebuilt has a fast tracked process. Prebuilt’s modular buildings allow you to resume operations within just months of the start of construction.
A fast tracked process not only allows for you to continue operations quicker, but also minimises disruptions to your patients, staff and visitors throughout construction.

Prefabricated Buildings For All Healthcare Needs

Prebuilt’s diverse experience in a range of different healthcare projects allows for us to provide flexible and innovative solutions to your project. With successful construction for community medical practices along with the seamless operation of wellness centres, Prebuilt’s experience and expertise ensures efficient construction of all healthcare projects.
Our modular designs adapt to your project’s needs, with flexibility in all aspects such as amenities, treatment zones and building facilities, a functional design is achieved.

Customised To Healthcare Facility Needs

Through the use of modular design, Prebuilt has the ability for customised building requirements that are aligned to patient, staff and overall healthcare requirements. From patient areas, treatment zones, medical suites, hospitality areas and more, Prebuilt can work with healthcare providers for a modular design that meets the needs of the facility.

Partnering With Industry Leaders

At Prebuilt, we are proud of our commitment to our partnerships with health industry leaders. Through our projects with Pascoe Vale Medical Practice, Thomas Embling Hospital and Peninsula Hot Springs, we provide experience and expertise in the health industry.

Talk to our team of commercial specialists about your project.

Call +61 3 9761 5544

Step 1 of 5

CATEGORY
CATEGORY

All

Commercial

What is the benefit of using modular construction in healthcare?

A fast tracked approach Minimal disturbance to residents/patients and healthcare operation due to the majority of work being undertaken off-site. While we are constructing your project in our factory, onsite works are taking place at the project site. We are able to transport and install our modules within 1-2 days typically and then complete final onsite works within weeks. Fixed costs & cost savings We do not start building until all of the design and documentation has been finalised. After which, we are able to accurately price your healthcare project before we start construction, ensuring your project falls within budget. Cost saving benefits can be achieved for healthcare projects with repetition based floorplans. This is ideal for patient rooms, accommodation facilities for patients or multiple treatment spaces with the same layout. Sustainability Modular construction is a sustainable way to build as it does not rely on traditional materials such as concrete or bricks. Prebuilt’s factory has a controlled recycling program, where plaster, tiles, steel and insulation are returned to approved recyclers.  Using BIM systems we are able to order exact quantities specific to each project, to reduce our wastage. Tailored design solutions We work closely with the client, architect and relevant consultants to ensure that all elements of the build are considered in the early planning stages of a healthcare facility's design. We work with DDA, hydraulic, electrical, lighting and building surveyors to reach the best outcome for your project and minimise changes down the track.

How long does a healthcare modular construction project typically take?

Modular construction is generally 40-50 per cent faster than traditional builds due to the majority of works taking place within a controlled factory environment. This also means building manufacture works can take place concurrently to site works, speeding the build timeline up even further. The construction phase is dependent on the size and scale of the project. On average the construction time of a healthcare facility can be achieved within months of completed IFC (issue for construction) documentation.  

What kind of projects in Healthcare has Prebuilt had exposure to?

Prebuilt has worked with various healthcare providers to deliver accommodation, dining, interview/ patient rooms, conference spaces, consultation rooms, waiting rooms, physiotherapy and medical treatment rooms and reception areas.